Extension and Rehabilitation of the Water and Wastewater Systems in Medias, Agnita and Dumbraveni, Sibiu County

Eptisa in association (50%) with Aqualia Infraestructuras SA will be responsible for the technical, structural and architectural design
Duration October 2010 - September 2013
Sector Water Treatment Plants (Water and Environment)
CountryRomania (Europe)

Description

In the first phase, the documentation for obtaining the building permit will be elaborated. In the construction phase, Eptisa will built in Agnita (EP of 9500 inhabitants) and Dumbraveni (EP of 7100 inhabitants) wastewater treatment plants, which will have two treatment phases: mechanical and biological. Both stations will develop modern wastewater treatment procedures and will be equipped with a fully automat system which will be connected to the SCADA system, in order to allow operation, control and monitoring of the treatment process.

Within the contract, Eptisa will be responsible for the acquisition and installation of the water-meters, laboratory and sludge detection equipments.

After finalization of the construction works, Eptisa will train the operational personnel of the Beneficiary on the operation and maintenance of the new plant for obtaining optimum operational parameters.

Versiunea în limba română este disponibilă aici