Feasibility study and detailed engineering design for water supply and waste water treatment systems in Romania

Eptisa prepared the Feasibility Study and the details of execution for the water supply, waste water collection systems and waste water treatment systems
Duration October 1996 – July 2000
Sector Hydraulic Infrastructure (Water and Environment)
Water Treatment Plants (Water and Environment)
CountryRomania (Europe)

Description

The project consisted in preparation of the study for 30 villages in Romania, with a population between 475 and 6.062 inhabitants located in 5 counties: Buzau, Covasna, Salaj, Suceava and Teleorman.

Activity

As a Consultant, Eptisa developed the following activities:

Phase 1: Elaboration of Feasibility Study that included:

  1. Financial analysis;
  2. Capacity analysis of water operators;
  3. Establishment of project costs;
  4. Financial impact study, etsablishment of financial feasibility;
  5. Tariffs estimation;
  6. Cost-benefit analyses;
  7. Financial plan of the project;
  8. Request estimation;
  9. Identification of water sources;
  10. Treatment system;
  11. Deposit and distribution systems;
  12. Treatment and sewage systems;
  13. Environment impact assessment.

Phase 2: Elaboration of the technical project and detail designs for the proposed solution in the FS: