COUNTRY

Uganda

CUSTOMER

Rural Electrification Agency of Uganda

YEAR

2019

2022

Project

Project Management and construction supervision for the project of bridging the demand supply gap through the accelerated Rural Electrification Programme

The project will cover 13 service territories

The proposed Project mainly focuses on construction of power distribution infrastructure for the electrification of all unserved sub-county headquarters and priority load growth centres within the 13 service territories

The consultant shall oversee the preparation of engineering designs for the project, undertake construction supervision with a focus on quality control and management, maintain an updated GIS data base for all the schemes implemented, facilitate project commissioning and handover and mobilise communities for connections to achieve the initial target of about 180,000 connections.

Main data:

  • Construction of over 4,000 km of 33kV Medium Voltage (MV) lines
  • Construction of about 6,000 km of low Voltage (LV) networks
  • Installations of over 3000 distribution transformers (mounted on poles)
  • Connection of 168,335 single-phase consumers and 4,254 three-phase consumers

Images

View on map

YOU MAY ALSO LIKE
The project will cover 13 service territories The proposed Project mainly focuses on construction of power distribution infrastructure for the electrification of all unserved…
Eptisa signed a contract with the Public Authority for Electricity and Water (PAEW) of Oman to provide expert consultancy services for the rehabilitation of…

Spain

Acciona Energía commissioned this project which, in the case of the Paso Nuevo dam, consisted of automation of the pendulum system by upgrading and…