{"id":2337,"date":"2022-11-03T14:50:43","date_gmt":"2022-11-03T13:50:43","guid":{"rendered":"https:\/\/eptisa.com\/?p=2337"},"modified":"2025-09-12T21:04:39","modified_gmt":"2025-09-12T19:04:39","slug":"the-public-road-administration-of-moldova-accepts-the-works-carried-out-by-eptisa","status":"publish","type":"post","link":"https:\/\/www.eptisa.com\/en\/the-public-road-administration-of-moldova-accepts-the-works-carried-out-by-eptisa\/","title":{"rendered":"The Public Road Administration of Moldova accepts the works carried out by Eptisa"},"content":{"rendered":"<p>The Public Road Administration of Moldova accepts the works carried out by Eptisa in the project &#8220;Supervision and Management of the construction works of the M3 Porumbrei &#8211; Cimi\u015flia road and the construction works of the M3 Comrat bypass&#8221;.<\/p>\n<p>The length of the Porumbrei &#8211; Cimi\u015flia road was 19 km and the length of the Comrat bypass was 18 km.<\/p>\n<p>The value of the contracts was more than 30 million euros each.<\/p>\n<p><iframe title=\"Receptia lucrarilor executatea la constructia drumului national M3 sector Porumbrei Cimislia 19 km\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/rD1snFpZP0g?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Public Road Administration of Moldova accepts the works carried out by Eptisa in the project &#8220;Supervision and Management of the construction works of the M3 Porumbrei &#8211; Cimi\u015flia road and the construction works of the M3 Comrat bypass&#8221;. The length of the Porumbrei &#8211; Cimi\u015flia road was 19 km and the length of the [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":1121,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[583],"tags":[],"class_list":["post-2337","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-civil-engineering"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/posts\/2337","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/comments?post=2337"}],"version-history":[{"count":0,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/posts\/2337\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/media\/1121"}],"wp:attachment":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/media?parent=2337"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/categories?post=2337"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/tags?post=2337"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}