{"id":2340,"date":"2022-11-07T09:45:12","date_gmt":"2022-11-07T08:45:12","guid":{"rendered":"https:\/\/eptisa.com\/?p=2340"},"modified":"2025-09-19T09:15:00","modified_gmt":"2025-09-19T07:15:00","slug":"new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway","status":"publish","type":"post","link":"https:\/\/www.eptisa.com\/en\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\/","title":{"rendered":"New Award: Drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway motorway."},"content":{"rendered":"<p><strong>Eptisa, in a 25% joint venture with Fulcrum, Sers and Carlos Fern\u00e1ndez Casado, has been awarded the ADIF contract for the drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway freeway. Section: Bobadilla Km 123.00 (Line 430)-Km 336.363 (Line 200). <\/strong><\/p>\n<p>This contract, worth 1,848,989.76 euros (VAT excluded) and with an estimated term of 14 months, consists of analyzing the gauge of the existing overpasses and footbridges on the future Algeciras-Zaragoza Railway Highway, from Bobadilla (km 123.057) on line 430 to km 336.363 on line 200. 336.363 of line 200. After the analysis of these gauges, and in those cases where the gauge determined by the Contract Management for the railway freeway is not met, the solutions to be adopted will be defined, which may be related to the lowering of the track, the replacement of existing overpasses with new ones, or other types of actions related to the modification of the catenary. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Eptisa, in a 25% joint venture with Fulcrum, Sers and Carlos Fern\u00e1ndez Casado, has been awarded the ADIF contract for the drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway freeway. Section: Bobadilla Km 123.00 (Line 430)-Km 336.363 (Line 200). This contract, worth 1,848,989.76 euros (VAT excluded) and [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[948,1118],"tags":[1161,1162,1163,1164],"class_list":["post-2340","post","type-post","status-publish","format-standard","hentry","category-civil-engineering-2","category-transport","tag-high-speed","tag-contract","tag-ferricarril","tag-project-3"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New Award: Drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway motorway.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eptisa.com\/en\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New Award: Drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway motorway.\" \/>\n<meta property=\"og:description\" content=\"Eptisa, in a 25% joint venture with Fulcrum, Sers and Carlos Fern\u00e1ndez Casado, has been awarded the ADIF contract for the drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway freeway. Section: Bobadilla Km 123.00 (Line 430)-Km 336.363 (Line 200). This contract, worth 1,848,989.76 euros (VAT excluded) and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eptisa.com\/en\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\/\" \/>\n<meta property=\"og:site_name\" content=\"Eptisa\" \/>\n<meta property=\"article:published_time\" content=\"2022-11-07T08:45:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-19T07:15:00+00:00\" \/>\n<meta name=\"author\" content=\"Margarita Marticorena\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Margarita Marticorena\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\\\/\"},\"author\":{\"name\":\"Margarita Marticorena\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#\\\/schema\\\/person\\\/7cf1f5d49be86d6748acfa485b6872d8\"},\"headline\":\"New Award: Drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway motorway.\",\"datePublished\":\"2022-11-07T08:45:12+00:00\",\"dateModified\":\"2025-09-19T07:15:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\\\/\"},\"wordCount\":167,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#organization\"},\"keywords\":[\"High Speed\",\"Contract\",\"Ferricarril\",\"Project\"],\"articleSection\":[\"Civil Engineering\",\"Transport\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\\\/\",\"url\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\\\/\",\"name\":\"New Award: Drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway motorway.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#website\"},\"datePublished\":\"2022-11-07T08:45:12+00:00\",\"dateModified\":\"2025-09-19T07:15:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New Award: Drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway motorway.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/\",\"name\":\"Eptisa\",\"description\":\"Empresa Multinacional de Ingenier\u00eda\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#organization\",\"name\":\"Eptisa\",\"url\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eptisa.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/7265704d3382618649eba7d99541ab81042c2245-scaled.png\",\"contentUrl\":\"https:\\\/\\\/www.eptisa.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/7265704d3382618649eba7d99541ab81042c2245-scaled.png\",\"width\":2560,\"height\":1067,\"caption\":\"Eptisa\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#\\\/schema\\\/person\\\/7cf1f5d49be86d6748acfa485b6872d8\",\"name\":\"Margarita Marticorena\",\"url\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/author\\\/marga\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New Award: Drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway motorway.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eptisa.com\/en\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\/","og_locale":"en_US","og_type":"article","og_title":"New Award: Drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway motorway.","og_description":"Eptisa, in a 25% joint venture with Fulcrum, Sers and Carlos Fern\u00e1ndez Casado, has been awarded the ADIF contract for the drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway freeway. Section: Bobadilla Km 123.00 (Line 430)-Km 336.363 (Line 200). This contract, worth 1,848,989.76 euros (VAT excluded) and [&hellip;]","og_url":"https:\/\/www.eptisa.com\/en\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\/","og_site_name":"Eptisa","article_published_time":"2022-11-07T08:45:12+00:00","article_modified_time":"2025-09-19T07:15:00+00:00","author":"Margarita Marticorena","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Margarita Marticorena","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eptisa.com\/en\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\/#article","isPartOf":{"@id":"https:\/\/www.eptisa.com\/en\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\/"},"author":{"name":"Margarita Marticorena","@id":"https:\/\/www.eptisa.com\/en\/#\/schema\/person\/7cf1f5d49be86d6748acfa485b6872d8"},"headline":"New Award: Drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway motorway.","datePublished":"2022-11-07T08:45:12+00:00","dateModified":"2025-09-19T07:15:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eptisa.com\/en\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\/"},"wordCount":167,"publisher":{"@id":"https:\/\/www.eptisa.com\/en\/#organization"},"keywords":["High Speed","Contract","Ferricarril","Project"],"articleSection":["Civil Engineering","Transport"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.eptisa.com\/en\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\/","url":"https:\/\/www.eptisa.com\/en\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\/","name":"New Award: Drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway motorway.","isPartOf":{"@id":"https:\/\/www.eptisa.com\/en\/#website"},"datePublished":"2022-11-07T08:45:12+00:00","dateModified":"2025-09-19T07:15:00+00:00","breadcrumb":{"@id":"https:\/\/www.eptisa.com\/en\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eptisa.com\/en\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.eptisa.com\/en\/new-award-drafting-of-the-construction-project-to-adapt-the-gauge-of-the-structures-of-the-algeciras-zaragoza-railway-motorway\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eptisa.com\/en\/"},{"@type":"ListItem","position":2,"name":"New Award: Drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway motorway."}]},{"@type":"WebSite","@id":"https:\/\/www.eptisa.com\/en\/#website","url":"https:\/\/www.eptisa.com\/en\/","name":"Eptisa","description":"Empresa Multinacional de Ingenier\u00eda","publisher":{"@id":"https:\/\/www.eptisa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eptisa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eptisa.com\/en\/#organization","name":"Eptisa","url":"https:\/\/www.eptisa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eptisa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eptisa.com\/wp-content\/uploads\/2025\/06\/7265704d3382618649eba7d99541ab81042c2245-scaled.png","contentUrl":"https:\/\/www.eptisa.com\/wp-content\/uploads\/2025\/06\/7265704d3382618649eba7d99541ab81042c2245-scaled.png","width":2560,"height":1067,"caption":"Eptisa"},"image":{"@id":"https:\/\/www.eptisa.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eptisa.com\/en\/#\/schema\/person\/7cf1f5d49be86d6748acfa485b6872d8","name":"Margarita Marticorena","url":"https:\/\/www.eptisa.com\/en\/author\/marga\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/posts\/2340","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/comments?post=2340"}],"version-history":[{"count":0,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/posts\/2340\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/media?parent=2340"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/categories?post=2340"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/tags?post=2340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}