{"id":2416,"date":"2024-03-20T10:41:45","date_gmt":"2024-03-20T09:41:45","guid":{"rendered":"https:\/\/eptisa.com\/?p=2416"},"modified":"2025-09-12T21:05:05","modified_gmt":"2025-09-12T19:05:05","slug":"eptisa-awards-a-new-contract-in-ethiopia","status":"publish","type":"post","link":"https:\/\/www.eptisa.com\/en\/eptisa-awards-a-new-contract-in-ethiopia\/","title":{"rendered":"Eptisa awards a new contract in Ethiopia"},"content":{"rendered":"<p><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-13979 alignleft\" src=\"https:\/\/eptisa.com\/wp-content\/uploads\/2025\/09\/photo_2024-02-17_08-45-22-300x225.jpg\" alt='' width=\"300\" height=\"225\" \/><strong><em>Eptisa has been awarded the contract for the project Consultancy to provide design and construction supervision services for the Construction of Pilot Project for the Project \u201cSupporting Watershed Development Master Plan Development for Addis Ababa City and Clearing Upstream of Sheger River\u201d<\/em><\/strong><\/p>\n<p>The objective is to convert the upstream areas of the Kebena River into clean and liv<img decoding=\"async\" class=\"size-medium wp-image-13980 alignright\" src=\"https:\/\/eptisa.com\/wp-content\/uploads\/2025\/09\/photo_2024-02-02_11-50-54-300x225.jpg\" alt='' width=\"300\" height=\"225\" \/>ely waterfront spaces through a pilot project.<\/p>\n<p>This project will expand green spaces using the shoreline, purify water and manage water resources, as well as promote the tourism industry and improve the residential environment.<\/p>\n<p><img decoding=\"async\" class=\"alignnone  wp-image-13981\" src=\"https:\/\/eptisa.com\/wp-content\/uploads\/2025\/09\/Foto-2-2-300x105.jpg\" alt='' width=\"642\" height=\"225\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Eptisa has been awarded the contract for the project Consultancy to provide design and construction supervision services for the Construction of Pilot Project for the Project \u201cSupporting Watershed Development Master Plan Development for Addis Ababa City and Clearing Upstream of Sheger River\u201d The objective is to convert the upstream areas of the Kebena River into [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":1648,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[684,685,686,687],"tags":[],"class_list":["post-2416","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-quality-control","category-environmentcivil-engineering","category-environmental-engineeringcivil-engineering-environmentcivil-engineering-2","category-water-treatments-environmental-engineeringcivil-engineering-environmentcivil-engineering-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/posts\/2416","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/comments?post=2416"}],"version-history":[{"count":0,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/posts\/2416\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/media\/1648"}],"wp:attachment":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/media?parent=2416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/categories?post=2416"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/tags?post=2416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}