{"id":2451,"date":"2024-07-31T09:57:29","date_gmt":"2024-07-31T07:57:29","guid":{"rendered":"https:\/\/eptisa.com\/?p=2451"},"modified":"2025-09-12T21:05:10","modified_gmt":"2025-09-12T19:05:10","slug":"new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass","status":"publish","type":"post","link":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/","title":{"rendered":"New contract award: Drafting of the construction project \u2018A-4 motorway, expansion of the capacity of the A-4 bypass\u2019."},"content":{"rendered":"<p>The joint venture formed by <strong>Eptisa<\/strong> and <strong>Proes<\/strong> has been awarded the contract by the Demarcaci\u00f3n de Carreteras de la Comunidad de Madrid (<strong>Ministry of Transport and Sustainable Mobility<\/strong>) for the construction project: <strong>A-4 dual carriageway, capacity expansion of the A-4 bypass (M-30\/M-40 by-pass).<\/strong><br \/>\nThis extension of the dual carriageway is located between the junctions of the M-40 and the M-45, and will be 5.5 km long.<br \/>\nThe project is mainly within the municipality of Madrid, with the final section reaching the municipality of Getafe.<br \/>\nThe main benefits of this extension are<\/p>\n<ul style=\"list-style-type: circle\">\n<li>Increasing the capacity of the A-4 section in this \u2018by-pass\u2019, as this motorway has three lanes before the A-4 junction in Getafe. three lanes before the M-40 junction and will have three again once it passes the M-45 junction. the M-45 junction. This will solve the traffic bottleneck created in this area.<\/li>\n<li>Improving the efficiency and overall functionality of the whole area, since there will be a zero pavement and equipment laydown.<\/li>\n<li>Improved road safety on the trunk and branches by adapting them to current geometric standards. current geometric standards.<\/li>\n<\/ul>\n<p><img decoding=\"async\" class=\"size-medium wp-image-14871 aligncenter\" src=\"https:\/\/eptisa.com\/wp-content\/uploads\/2025\/09\/seccion-1-300x77.png\" alt='' width=\"300\" height=\"77\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The joint venture formed by Eptisa and Proes has been awarded the contract by the Demarcaci\u00f3n de Carreteras de la Comunidad de Madrid (Ministry of Transport and Sustainable Mobility) for the construction project: A-4 dual carriageway, capacity expansion of the A-4 bypass (M-30\/M-40 by-pass). This extension of the dual carriageway is located between the junctions [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":1645,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[583,584],"tags":[650,720,721],"class_list":["post-2451","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-civil-engineering","category-transport","tag-new-award-2","tag-roads-2","tag-spain-2"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New contract award: Drafting of the construction project \u2018A-4 motorway, expansion of the capacity of the A-4 bypass\u2019.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New contract award: Drafting of the construction project \u2018A-4 motorway, expansion of the capacity of the A-4 bypass\u2019.\" \/>\n<meta property=\"og:description\" content=\"The joint venture formed by Eptisa and Proes has been awarded the contract by the Demarcaci\u00f3n de Carreteras de la Comunidad de Madrid (Ministry of Transport and Sustainable Mobility) for the construction project: A-4 dual carriageway, capacity expansion of the A-4 bypass (M-30\/M-40 by-pass). This extension of the dual carriageway is located between the junctions [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/\" \/>\n<meta property=\"og:site_name\" content=\"Eptisa\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-31T07:57:29+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-12T19:05:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eptisa.com\/wp-content\/uploads\/2025\/09\/Foto-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"802\" \/>\n\t<meta property=\"og:image:height\" content=\"785\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Margarita Marticorena\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Margarita Marticorena\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\\\/\"},\"author\":{\"name\":\"Margarita Marticorena\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#\\\/schema\\\/person\\\/7cf1f5d49be86d6748acfa485b6872d8\"},\"headline\":\"New contract award: Drafting of the construction project \u2018A-4 motorway, expansion of the capacity of the A-4 bypass\u2019.\",\"datePublished\":\"2024-07-31T07:57:29+00:00\",\"dateModified\":\"2025-09-12T19:05:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\\\/\"},\"wordCount\":201,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eptisa.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/Foto-1.png\",\"keywords\":[\"New Award\",\"roads\",\"Spain\"],\"articleSection\":[\"Civil Engineering\",\"Transport\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\\\/\",\"url\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\\\/\",\"name\":\"New contract award: Drafting of the construction project \u2018A-4 motorway, expansion of the capacity of the A-4 bypass\u2019.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eptisa.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/Foto-1.png\",\"datePublished\":\"2024-07-31T07:57:29+00:00\",\"dateModified\":\"2025-09-12T19:05:10+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eptisa.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/Foto-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eptisa.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/Foto-1.png\",\"width\":802,\"height\":785,\"caption\":\"|\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New contract award: Drafting of the construction project \u2018A-4 motorway, expansion of the capacity of the A-4 bypass\u2019.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/\",\"name\":\"Eptisa\",\"description\":\"Empresa Multinacional de Ingenier\u00eda\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#organization\",\"name\":\"Eptisa\",\"url\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eptisa.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/7265704d3382618649eba7d99541ab81042c2245-scaled.png\",\"contentUrl\":\"https:\\\/\\\/www.eptisa.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/7265704d3382618649eba7d99541ab81042c2245-scaled.png\",\"width\":2560,\"height\":1067,\"caption\":\"Eptisa\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/#\\\/schema\\\/person\\\/7cf1f5d49be86d6748acfa485b6872d8\",\"name\":\"Margarita Marticorena\",\"url\":\"https:\\\/\\\/www.eptisa.com\\\/en\\\/author\\\/marga\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New contract award: Drafting of the construction project \u2018A-4 motorway, expansion of the capacity of the A-4 bypass\u2019.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/","og_locale":"en_US","og_type":"article","og_title":"New contract award: Drafting of the construction project \u2018A-4 motorway, expansion of the capacity of the A-4 bypass\u2019.","og_description":"The joint venture formed by Eptisa and Proes has been awarded the contract by the Demarcaci\u00f3n de Carreteras de la Comunidad de Madrid (Ministry of Transport and Sustainable Mobility) for the construction project: A-4 dual carriageway, capacity expansion of the A-4 bypass (M-30\/M-40 by-pass). This extension of the dual carriageway is located between the junctions [&hellip;]","og_url":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/","og_site_name":"Eptisa","article_published_time":"2024-07-31T07:57:29+00:00","article_modified_time":"2025-09-12T19:05:10+00:00","og_image":[{"width":802,"height":785,"url":"https:\/\/www.eptisa.com\/wp-content\/uploads\/2025\/09\/Foto-1.png","type":"image\/png"}],"author":"Margarita Marticorena","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Margarita Marticorena","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/#article","isPartOf":{"@id":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/"},"author":{"name":"Margarita Marticorena","@id":"https:\/\/www.eptisa.com\/en\/#\/schema\/person\/7cf1f5d49be86d6748acfa485b6872d8"},"headline":"New contract award: Drafting of the construction project \u2018A-4 motorway, expansion of the capacity of the A-4 bypass\u2019.","datePublished":"2024-07-31T07:57:29+00:00","dateModified":"2025-09-12T19:05:10+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/"},"wordCount":201,"publisher":{"@id":"https:\/\/www.eptisa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eptisa.com\/wp-content\/uploads\/2025\/09\/Foto-1.png","keywords":["New Award","roads","Spain"],"articleSection":["Civil Engineering","Transport"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/","url":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/","name":"New contract award: Drafting of the construction project \u2018A-4 motorway, expansion of the capacity of the A-4 bypass\u2019.","isPartOf":{"@id":"https:\/\/www.eptisa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/#primaryimage"},"image":{"@id":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eptisa.com\/wp-content\/uploads\/2025\/09\/Foto-1.png","datePublished":"2024-07-31T07:57:29+00:00","dateModified":"2025-09-12T19:05:10+00:00","breadcrumb":{"@id":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/#primaryimage","url":"https:\/\/www.eptisa.com\/wp-content\/uploads\/2025\/09\/Foto-1.png","contentUrl":"https:\/\/www.eptisa.com\/wp-content\/uploads\/2025\/09\/Foto-1.png","width":802,"height":785,"caption":"|"},{"@type":"BreadcrumbList","@id":"https:\/\/www.eptisa.com\/en\/new-contract-award-drafting-of-the-construction-project-a-4-motorway-expansion-of-the-capacity-of-the-a-4-bypass\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eptisa.com\/en\/"},{"@type":"ListItem","position":2,"name":"New contract award: Drafting of the construction project \u2018A-4 motorway, expansion of the capacity of the A-4 bypass\u2019."}]},{"@type":"WebSite","@id":"https:\/\/www.eptisa.com\/en\/#website","url":"https:\/\/www.eptisa.com\/en\/","name":"Eptisa","description":"Empresa Multinacional de Ingenier\u00eda","publisher":{"@id":"https:\/\/www.eptisa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eptisa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eptisa.com\/en\/#organization","name":"Eptisa","url":"https:\/\/www.eptisa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eptisa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eptisa.com\/wp-content\/uploads\/2025\/06\/7265704d3382618649eba7d99541ab81042c2245-scaled.png","contentUrl":"https:\/\/www.eptisa.com\/wp-content\/uploads\/2025\/06\/7265704d3382618649eba7d99541ab81042c2245-scaled.png","width":2560,"height":1067,"caption":"Eptisa"},"image":{"@id":"https:\/\/www.eptisa.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eptisa.com\/en\/#\/schema\/person\/7cf1f5d49be86d6748acfa485b6872d8","name":"Margarita Marticorena","url":"https:\/\/www.eptisa.com\/en\/author\/marga\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/posts\/2451","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/comments?post=2451"}],"version-history":[{"count":0,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/posts\/2451\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/media\/1645"}],"wp:attachment":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/media?parent=2451"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/categories?post=2451"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/tags?post=2451"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}