{"id":2960,"date":"2025-09-08T20:08:15","date_gmt":"2025-09-08T18:08:15","guid":{"rendered":"https:\/\/eptisa.com\/proyectos\/infrastructure-and-track-improvement-project-in-the-covas-monforte-de-lemos-section\/"},"modified":"2025-09-18T22:51:42","modified_gmt":"2025-09-18T20:51:42","slug":"infrastructure-and-track-improvement-project-in-the-covas-monforte-de-lemos-section","status":"publish","type":"proyectos","link":"https:\/\/www.eptisa.com\/en\/projects\/infrastructure-and-track-improvement-project-in-the-covas-monforte-de-lemos-section\/","title":{"rendered":"Infrastructure and Track Improvement Project in the Covas &#8211; Monforte de Lemos Section."},"content":{"rendered":"\n<h4 class=\"wp-block-heading\">The purpose of this project is to define the necessary actions for the improvement of the infrastructure and track of the section between <strong>Montefurado station and Monforte de Lemos station<\/strong>, belonging to the Le\u00f3n &#8211; A Coru\u00f1a line, in a length of more than <strong>40 kilometers<\/strong>.<\/h4>\n\n<p class=\"wp-block-paragraph\">The contract seeks to solve recurring problems affecting the <strong>operation and increase of freight traffic<\/strong>, improving the reliability and capacity of the line.<\/p>\n\n<h5 class=\"wp-block-heading\"><strong>Scope of the project:<\/strong><\/h5>\n\n<ul class=\"wp-block-list\">\n<li>Track replacement and improvement: rail, sleepers and ballast.<\/li>\n\n\n\n<li>Optimization of the railway route.<\/li>\n\n\n\n<li>Execution of earthworks and drainage.<\/li>\n\n\n\n<li>Revision and adaptation of existing structures and tunnels.<\/li>\n\n\n\n<li><strong>Widening of all structures<\/strong> and tunnels to comply with the <strong>AF-4.0 railroad highway<\/strong> gauge.<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n<h5 class=\"wp-block-heading\"><strong>Project Impact:<\/strong><\/h5>\n\n<p class=\"wp-block-paragraph\">The intervention will <strong>increase the operational efficiency<\/strong> of a strategic line for rail freight transport in the northwest of the peninsula, improving safety, reducing maintenance costs and preparing the infrastructure for larger and higher volume traffic.<\/p>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"featured_media":2961,"template":"","meta":{"_acf_changed":false},"actividad":[751,754],"area-geografica":[813,815],"etiqueta-proyecto":[841,842,843,844,845,846],"class_list":["post-2960","proyectos","type-proyectos","status-publish","has-post-thumbnail","hentry","actividad-transport","actividad-railways","area-geografica-europe","area-geografica-spain","etiqueta-proyecto-infrastructures","etiqueta-proyecto-europe","etiqueta-proyecto-design","etiqueta-proyecto-project","etiqueta-proyecto-transport","etiqueta-proyecto-railways"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/proyectos\/2960","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/media\/2961"}],"wp:attachment":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/media?parent=2960"}],"wp:term":[{"taxonomy":"actividad","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/actividad?post=2960"},{"taxonomy":"area-geografica","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/area-geografica?post=2960"},{"taxonomy":"etiqueta-proyecto","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/etiqueta-proyecto?post=2960"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}