{"id":3512,"date":"2025-09-07T16:42:20","date_gmt":"2025-09-07T14:42:20","guid":{"rendered":"https:\/\/eptisa.com\/proyectos\/design-and-supervision-of-42-public-schools-in-istanbul\/"},"modified":"2025-09-19T03:16:04","modified_gmt":"2025-09-19T01:16:04","slug":"design-and-supervision-of-42-public-schools-in-istanbul","status":"publish","type":"proyectos","link":"https:\/\/www.eptisa.com\/en\/projects\/design-and-supervision-of-42-public-schools-in-istanbul\/","title":{"rendered":"Design and Supervision of 42 Public Schools in Istanbul"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Eptisa provides comprehensive consulting services for the <strong>design and supervision of the construction of 42 educational centers<\/strong> in Istanbul, with a total area of <strong>280,000 m\u00b2.<\/strong> The project replaces obsolete infrastructure with modern, safe schools adapted to current educational and technical standards. Initially planned to include the reconstruction of the Etiler Police Academy Dormitory Building, this component was cancelled and replaced by 2 additional schools.  <\/p>\n\n<h5 class=\"wp-block-heading\"><strong>Activity highlights:<\/strong><\/h5>\n\n<ul class=\"wp-block-list\">\n<li>Data collection, topographic and geotechnical studies<\/li>\n\n\n\n<li>Architectural design and complete engineering (structural, mechanical, electrical, landscaping and infrastructure)<\/li>\n\n\n\n<li>Preparation of bidding documents according to international standards (WB, IDB, WB)<\/li>\n\n\n\n<li>Technical supervision during construction and during the warranty period<\/li>\n\n\n\n<li>Contract management under FIDIC conditions Red Book<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n<h5 class=\"wp-block-heading\"><strong>Project phases:<\/strong><\/h5>\n\n<p class=\"wp-block-paragraph\"><strong>Phase I:<\/strong> Preliminary and final design, site planning, cost estimation, preparation of bid documentation and bid evaluation<br\/><strong>Phase II:<\/strong> Supervision of works and engineering services during execution and maintenance phase<\/p>\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n<h5 class=\"wp-block-heading\"><strong>Impact:<\/strong><\/h5>\n\n<p class=\"wp-block-paragraph\">A key project to improve Istanbul&#8217;s educational infrastructure, increasing school capacity and ensuring modern, safe and sustainable learning environments.<\/p>\n","protected":false},"featured_media":3514,"template":"","meta":{"_acf_changed":false},"actividad":[788,794],"area-geografica":[813,820],"etiqueta-proyecto":[842,843,844,886,889,901],"class_list":["post-3512","proyectos","type-proyectos","status-publish","has-post-thumbnail","hentry","actividad-building-and-architecture","actividad-institutional-building","area-geografica-europe","area-geografica-turkiye","etiqueta-proyecto-europe","etiqueta-proyecto-design","etiqueta-proyecto-project","etiqueta-proyecto-construction-supervision","etiqueta-proyecto-building","etiqueta-proyecto-institutional"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/proyectos\/3512","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/media\/3514"}],"wp:attachment":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/media?parent=3512"}],"wp:term":[{"taxonomy":"actividad","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/actividad?post=3512"},{"taxonomy":"area-geografica","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/area-geografica?post=3512"},{"taxonomy":"etiqueta-proyecto","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/etiqueta-proyecto?post=3512"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}