{"id":3566,"date":"2025-09-08T14:19:25","date_gmt":"2025-09-08T12:19:25","guid":{"rendered":"https:\/\/eptisa.com\/proyectos\/improved-connectivity-of-the-a-23-highway-with-the-v-23-and-the-ap-7-highway\/"},"modified":"2025-09-19T03:16:26","modified_gmt":"2025-09-19T01:16:26","slug":"improved-connectivity-of-the-a-23-highway-with-the-v-23-and-the-ap-7-highway","status":"publish","type":"proyectos","link":"https:\/\/www.eptisa.com\/en\/projects\/improved-connectivity-of-the-a-23-highway-with-the-v-23-and-the-ap-7-highway\/","title":{"rendered":"Improved connectivity of the A-23 highway with the V-23 and the AP-7 highway."},"content":{"rendered":"\n<h4 class=\"wp-block-heading\">The objective of this project is to <strong>improve the connectivity between the A-23 highway, the V-23 and the AP-7 highway<\/strong>, in an area of high traffic density and strategic relevance for the Mediterranean corridor.<\/h4>\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n<h5 class=\"wp-block-heading\"><strong>The actions contemplated include:<\/strong><\/h5>\n\n<ul class=\"wp-block-list\">\n<li><strong>Redesign of the A-23 \/ V-23 \/ N-340 junction<\/strong> as a junction with directional branches, improving traffic flow and safety.<\/li>\n\n\n\n<li> <strong>Geometric optimization of the A-23 \/ AP-7 junction<\/strong>, improving all existing connections through adjustments in layout and design.<\/li>\n\n\n\n<li><strong>Improved local connectivity<\/strong> in the vicinity of both links.<\/li>\n\n\n\n<li><strong>Rehabilitation of the section of the A-23<\/strong> between the two junctions to improve its functionality.<\/li>\n\n\n\n<li><strong>Expansion of the capacity of the AP-7<\/strong>, in the section between the AP-7\/A-23 junction and the AP-7\/A-7 fork.<\/li>\n\n\n\n<li><strong>Construction of 18 new structures<\/strong>, including overpasses, underpasses and viaducts, to guarantee the functionality of the projected road system.<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n<h5 class=\"wp-block-heading\"><strong>Project Impact:<\/strong><br\/><\/h5>\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n<p class=\"wp-block-paragraph\">The intervention will <strong>increase traffic capacity and safety<\/strong>, reduce travel times, and strengthen the logistical and territorial connectivity of the Mediterranean arc.<\/p>\n","protected":false},"featured_media":3567,"template":"","meta":{"_acf_changed":false},"actividad":[751,752],"area-geografica":[813,815],"etiqueta-proyecto":[841,842,843,844,845,935],"class_list":["post-3566","proyectos","type-proyectos","status-publish","has-post-thumbnail","hentry","actividad-transport","actividad-roads","area-geografica-europe","area-geografica-spain","etiqueta-proyecto-infrastructures","etiqueta-proyecto-europe","etiqueta-proyecto-design","etiqueta-proyecto-project","etiqueta-proyecto-transport","etiqueta-proyecto-roads"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/proyectos\/3566","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/media\/3567"}],"wp:attachment":[{"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/media?parent=3566"}],"wp:term":[{"taxonomy":"actividad","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/actividad?post=3566"},{"taxonomy":"area-geografica","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/area-geografica?post=3566"},{"taxonomy":"etiqueta-proyecto","embeddable":true,"href":"https:\/\/www.eptisa.com\/en\/wp-json\/wp\/v2\/etiqueta-proyecto?post=3566"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}