Playa del Inglés Bypass Construction Project

This project focuses on the design of the railway platform for an approximately 9-kilometer bypass section of the future railway line connecting Las Palmas de Gran Canaria and Maspalomas. It also includes the design of the intermodal station at Playa del Inglés. The Scope of Work Includes: Project Impact: This variant is key to guaranteeing […]

Improved connectivity of the A-23 highway with the V-23 and the AP-7 highway.

The objective of this project is to improve the connectivity between the A-23 highway, the V-23 and the AP-7 highway, in an area of high traffic density and strategic relevance for the Mediterranean corridor. The actions contemplated include: Project Impact: The intervention will increase traffic capacity and safety, reduce travel times, and strengthen the logistical […]

Support for Rural Bridges Program (SupRB) – Design Consultancy Contract

Eptisa leads the design and technical assistance services for the Support Program for Rural Bridges (SupRB), contributing to improve connectivity and resilience of infrastructure in rural areas through the construction, rehabilitation or expansion of bridges under local and international standards. Scope of the design: Services provided: Impact: The project improves accessibility, road safety and regional […]

Rural Connectivity Improvement Project – Consultancy for Detailed Project Report

The Rural Connectivity Improvement Project (RCIP) aims to improve rural road infrastructure in climate-vulnerable areas of Bangladesh, connecting agricultural areas to markets and socioeconomic centers. Eptisa is leading the preparation of the feasibility study and technical documentation for the design of RCIP-II, a future investment phase supported by the ADB. Key services: Impact: Year-round connectivity […]

Design and Supervision for the Improvement of the Drinking Water and Sanitation System in Osh, Jalal-Abad and Bazar-Korgon

This project aims to improve drinking water supply and sanitation systems in the municipalities of Osh, Jalal-Abad and Bazar-Korgon under Component 3 of the ADB-funded program. Actions include the rehabilitation and construction of critical water and sanitation infrastructure, from catchments and pipelines to treatment plants and urban collectors. Main interventions: Services provided: Expected impact: This […]

Detailed Design and Bidding Documents for Rositas Hydroelectric Project

The objective of the project is to prepare the detailed design of the Rositas hydroelectric power plant and prepare all the necessary documentation for its bidding and construction. In addition, it includes the review and update of the pre-feasibility study of the complete hydroelectric development of the Rio Grande (6 plants), as well as the […]

Support for the Integrated Waste Management Program in Jujuy

The main objective of this program is to establish a sustainable urban solid waste (USW) management system in the province of Jujuy, thus contributing to the protection of the environment and the reduction of greenhouse gases. A complete diagnosis of the initial situation was carried out, based on which a comprehensive action plan was designed: […]

Design and Supervision of 42 Public Schools in Istanbul

Eptisa provides comprehensive consulting services for the design and supervision of the construction of 42 educational centers in Istanbul, with a total area of 280,000 m². The project replaces obsolete infrastructure with modern, safe schools adapted to current educational and technical standards. Initially planned to include the reconstruction of the Etiler Police Academy Dormitory Building, […]