Playa del Inglés Bypass Construction Project

This project focuses on the design of the railway platform for an approximately 9-kilometer bypass section of the future railway line connecting Las Palmas de Gran Canaria and Maspalomas. It also includes the design of the intermodal station at Playa del Inglés. The Scope of Work Includes: Project Impact: This variant is key to guaranteeing […]

Supervision of Batajnica Intermodal Terminal (Belgrade)

Eptisa carried out the integral supervision of the construction of the Batajnica intermodal terminal in Belgrade, a strategic node connecting road and rail transport. The project is part of the modernization of the Serbian transport system and is aligned with European Union regulations. Scope of services: Key results: Impact: Direct contribution to Serbia’s national sustainable […]

Improved connectivity of the A-23 highway with the V-23 and the AP-7 highway.

The objective of this project is to improve the connectivity between the A-23 highway, the V-23 and the AP-7 highway, in an area of high traffic density and strategic relevance for the Mediterranean corridor. The actions contemplated include: Project Impact: The intervention will increase traffic capacity and safety, reduce travel times, and strengthen the logistical […]

“Clean Serbia” – Sanitation Infrastructure Supervision

Within the framework of the national program “Clean Serbia”, Eptisa provides integral technical supervision services for the construction and rehabilitation of communal infrastructure in 16 localities in the country, in the first phase of the program. The project is governed by the FIDIC General Conditions of Contract (Yellow Book). Scope of services: Program focus: Impact: […]

Improvement of Water-Communal Infrastructure in Rijeka Agglomeration Area

The objective of the project is to provide supervision services for the execution of the contract for the design and construction of the new Wastewater Treatment Plant (WWTP) in Rijeka, with a capacity of 200,000 population equivalent, and second grade treatment, within the framework of the project for the improvement of the water infrastructure in […]

Environmental Restoration Project for the Fosfoyesos Piles.

EPTISA is leading the environmental restoration of 720 hectares of phosphogypsum piles in the city of Huelva, an action of great technical complexity and high ecological value. The project includes: Current phase: EPTISA is currently in charge of the Project Management of the works, the execution of which is planned to take ten years, making […]

Supervision of the construction of the Dried Apricots Warehouse and Market in Malatya

Eptisa is leading the technical, administrative and contractual supervision services for the construction of the Malatya Dried Apricot Licensed Warehouse and Exchange Center, with the objective of promoting the socio-economic development of the region and modernizing the apricot value chain. The contract is being executed in accordance with the FIDIC Conditions for Construction (Red Book, […]