Playa del Inglés Bypass Construction Project

This project focuses on the design of the railway platform for an approximately 9-kilometer bypass section of the future railway line connecting Las Palmas de Gran Canaria and Maspalomas. It also includes the design of the intermodal station at Playa del Inglés. The Scope of Work Includes: Project Impact: This variant is key to guaranteeing […]
Infrastructure and Track Improvement Project in the Covas – Monforte de Lemos Section.

The purpose of this project is to define the necessary actions for the improvement of the infrastructure and track of the section between Montefurado station and Monforte de Lemos station, belonging to the León – A Coruña line, in a length of more than 40 kilometers. The contract seeks to solve recurring problems affecting the […]
Construction Supervision of the Çerkezköy – Kapıkule Section of the Halkalı – Kapıkule Railway Line.

Eptisa is leading the supervision of the construction of the Çerkezköy – Kapıkule section, with a length of 152.9 km, double track, design speed of 200 km/h, electrification at 25 kV and ERTMS/ETCS Level 1 signaling system. This ambitious project, awarded by FIDIC as “Project of the Year 2021”, stands out for its focus on […]
Supervision of Batajnica Intermodal Terminal (Belgrade)

Eptisa carried out the integral supervision of the construction of the Batajnica intermodal terminal in Belgrade, a strategic node connecting road and rail transport. The project is part of the modernization of the Serbian transport system and is aligned with European Union regulations. Scope of services: Key results: Impact: Direct contribution to Serbia’s national sustainable […]
Study and Preparation of the Road Safety Plan for the Autonomous Road Network of Castilla-La Mancha.

The objective of the project is to improve road safety in a regional road network of almost 9,000 km, through a set of technical actions of analysis, evaluation and planning. Eptisa has developed a wide range of specialized services, which have provided the regional administration with a solid basis for strategic decision-making in accident prevention. […]
Improved connectivity of the A-23 highway with the V-23 and the AP-7 highway.

The objective of this project is to improve the connectivity between the A-23 highway, the V-23 and the AP-7 highway, in an area of high traffic density and strategic relevance for the Mediterranean corridor. The actions contemplated include: Project Impact: The intervention will increase traffic capacity and safety, reduce travel times, and strengthen the logistical […]
Support for Rural Bridges Program (SupRB) – Design Consultancy Contract

Eptisa leads the design and technical assistance services for the Support Program for Rural Bridges (SupRB), contributing to improve connectivity and resilience of infrastructure in rural areas through the construction, rehabilitation or expansion of bridges under local and international standards. Scope of the design: Services provided: Impact: The project improves accessibility, road safety and regional […]
Rural Connectivity Improvement Project – Consultancy for Detailed Project Report

The Rural Connectivity Improvement Project (RCIP) aims to improve rural road infrastructure in climate-vulnerable areas of Bangladesh, connecting agricultural areas to markets and socioeconomic centers. Eptisa is leading the preparation of the feasibility study and technical documentation for the design of RCIP-II, a future investment phase supported by the ADB. Key services: Impact: Year-round connectivity […]
“Clean Serbia” – Sanitation Infrastructure Supervision

Within the framework of the national program “Clean Serbia”, Eptisa provides integral technical supervision services for the construction and rehabilitation of communal infrastructure in 16 localities in the country, in the first phase of the program. The project is governed by the FIDIC General Conditions of Contract (Yellow Book). Scope of services: Program focus: Impact: […]
Design and Supervision for the Improvement of the Drinking Water and Sanitation System in Osh, Jalal-Abad and Bazar-Korgon

This project aims to improve drinking water supply and sanitation systems in the municipalities of Osh, Jalal-Abad and Bazar-Korgon under Component 3 of the ADB-funded program. Actions include the rehabilitation and construction of critical water and sanitation infrastructure, from catchments and pipelines to treatment plants and urban collectors. Main interventions: Services provided: Expected impact: This […]