Supervision of Batajnica Intermodal Terminal (Belgrade)

Eptisa carried out the integral supervision of the construction of the Batajnica intermodal terminal in Belgrade, a strategic node connecting road and rail transport. The project is part of the modernization of the Serbian transport system and is aligned with European Union regulations. Scope of services: Key results: Impact: Direct contribution to Serbia’s national sustainable […]

Improved connectivity of the A-23 highway with the V-23 and the AP-7 highway.

The objective of this project is to improve the connectivity between the A-23 highway, the V-23 and the AP-7 highway, in an area of high traffic density and strategic relevance for the Mediterranean corridor. The actions contemplated include: Project Impact: The intervention will increase traffic capacity and safety, reduce travel times, and strengthen the logistical […]

Support for Rural Bridges Program (SupRB) – Design Consultancy Contract

Eptisa leads the design and technical assistance services for the Support Program for Rural Bridges (SupRB), contributing to improve connectivity and resilience of infrastructure in rural areas through the construction, rehabilitation or expansion of bridges under local and international standards. Scope of the design: Services provided: Impact: The project improves accessibility, road safety and regional […]

Rural Connectivity Improvement Project – Consultancy for Detailed Project Report

The Rural Connectivity Improvement Project (RCIP) aims to improve rural road infrastructure in climate-vulnerable areas of Bangladesh, connecting agricultural areas to markets and socioeconomic centers. Eptisa is leading the preparation of the feasibility study and technical documentation for the design of RCIP-II, a future investment phase supported by the ADB. Key services: Impact: Year-round connectivity […]

Technical and Socio-environmental Supervision – San José de Chiquitos – San Ignacio de Velasco Highway

Regulations: FIDIC – Conditions of Contract for Construction Works Comprehensive supervision of a strategic highway that forms part of the East-West Corridor, connecting Bolivia with Brazil, Chile and Peru. The project includes construction quality control, design validation, road safety audit, and environmental and social management, including resettlement plans and inclusion of indigenous peoples. Impact: Role […]

Construction Supervision and Control – “El Sillar” Dual Carriageway

The “El Sillar” section, between km 100 and 128 of the Cochabamba-Santa Cruz highway, is one of the most critical areas of the Bolivian road network due to its complex geology, rugged topography and high rainfall. This 28 km infrastructure is a key part of the Bioceanic Corridor, connecting the country’s eastern and western borders […]