Eptisa, in a 25% joint venture with Fulcrum, Sers and Carlos Fernández Casado, has been awarded the ADIF contract for the drafting of the construction project to adapt the gauge of the structures of the Algeciras-Zaragoza railway freeway. Section: Bobadilla Km 123.00 (Line 430)-Km 336.363 (Line 200).
This contract, worth 1,848,989.76 euros (VAT excluded) and with an estimated term of 14 months, consists of analyzing the gauge of the existing overpasses and footbridges on the future Algeciras-Zaragoza Railway Highway, from Bobadilla (km 123.057) on line 430 to km 336.363 on line 200. 336.363 of line 200. After the analysis of these gauges, and in those cases where the gauge determined by the Contract Management for the railway freeway is not met, the solutions to be adopted will be defined, which may be related to the lowering of the track, the replacement of existing overpasses with new ones, or other types of actions related to the modification of the catenary.