Playa del Inglés Bypass Construction Project

This project focuses on the design of the railway platform for an approximately 9-kilometer bypass section of the future railway line connecting Las Palmas de Gran Canaria and Maspalomas. It also includes the design of the intermodal station at Playa del Inglés. The Scope of Work Includes: Project Impact: This variant is key to guaranteeing […]
Infrastructure and Track Improvement Project in the Covas – Monforte de Lemos Section.

The purpose of this project is to define the necessary actions for the improvement of the infrastructure and track of the section between Montefurado station and Monforte de Lemos station, belonging to the León – A Coruña line, in a length of more than 40 kilometers. The contract seeks to solve recurring problems affecting the […]
Construction Supervision of the Çerkezköy – Kapıkule Section of the Halkalı – Kapıkule Railway Line.

Eptisa is leading the supervision of the construction of the Çerkezköy – Kapıkule section, with a length of 152.9 km, double track, design speed of 200 km/h, electrification at 25 kV and ERTMS/ETCS Level 1 signaling system. This ambitious project, awarded by FIDIC as “Project of the Year 2021”, stands out for its focus on […]
Supervision of Batajnica Intermodal Terminal (Belgrade)

Eptisa carried out the integral supervision of the construction of the Batajnica intermodal terminal in Belgrade, a strategic node connecting road and rail transport. The project is part of the modernization of the Serbian transport system and is aligned with European Union regulations. Scope of services: Key results: Impact: Direct contribution to Serbia’s national sustainable […]