Together for a better future

Together for a better future

DATE

The Public Road Administration of Moldova accepts the works carried out by Eptisa

The Public Road Administration of Moldova accepts the works carried out by Eptisa in the project “Supervision and Management of the construction works of the M3 Porumbrei – Cimişlia road and the construction works of the M3 Comrat bypass”.

The length of the Porumbrei – Cimişlia road was 19 km and the length of the Comrat bypass was 18 km.

The value of the contracts was more than 30 million euros each.

YOU MAY ALSO LIKE